DocumentCode
1750195
Title
Experience in the implementation of interfacing work between substation control system to legacy SCADA system in TNB, Malaysia
Author
Tajul-Arus, Z. ; Wan-Kamarulzaman, W.A.
Author_Institution
Distribution Eng. Dept, Tenaga Nasional Berhada, Malaysia
Volume
3
fYear
2001
fDate
2001
Abstract
This paper describes the experience in implementing a telecontrol protocol interface between a substation control system (SCS) and legacy master station in TNB. The core interfacing work is the protocol test. This paper discusses principles and test case design strategies to ensure protocol compliance
Keywords
SCADA systems; power system control; protocols; substations; telecontrol; Malaysia; SCADA; TNB; legacy SCADA system; protocol compliance; protocol test; substation control system; telecontrol protocol interface; test case design strategies;
fLanguage
English
Publisher
iet
Conference_Titel
Electricity Distribution, 2001. Part 1: Contributions. CIRED. 16th International Conference and Exhibition on (IEE Conf. Publ No. 482)
Conference_Location
Amsterdam
ISSN
0537-9989
Print_ISBN
0-85296-735-7
Type
conf
DOI
10.1049/cp:20010816
Filename
942961
Link To Document