• DocumentCode
    1750195
  • Title

    Experience in the implementation of interfacing work between substation control system to legacy SCADA system in TNB, Malaysia

  • Author

    Tajul-Arus, Z. ; Wan-Kamarulzaman, W.A.

  • Author_Institution
    Distribution Eng. Dept, Tenaga Nasional Berhada, Malaysia
  • Volume
    3
  • fYear
    2001
  • fDate
    2001
  • Abstract
    This paper describes the experience in implementing a telecontrol protocol interface between a substation control system (SCS) and legacy master station in TNB. The core interfacing work is the protocol test. This paper discusses principles and test case design strategies to ensure protocol compliance
  • Keywords
    SCADA systems; power system control; protocols; substations; telecontrol; Malaysia; SCADA; TNB; legacy SCADA system; protocol compliance; protocol test; substation control system; telecontrol protocol interface; test case design strategies;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electricity Distribution, 2001. Part 1: Contributions. CIRED. 16th International Conference and Exhibition on (IEE Conf. Publ No. 482)
  • Conference_Location
    Amsterdam
  • ISSN
    0537-9989
  • Print_ISBN
    0-85296-735-7
  • Type

    conf

  • DOI
    10.1049/cp:20010816
  • Filename
    942961