DocumentCode :
1750763
Title :
Interactive fuzzy programming for a decentralized two-level transportation planning and work force assignment problem
Author :
Sakawa, M. ; Nishizaki, Ichiro ; Uemura, Yoshio
Author_Institution :
Grad. Sch. of Eng., Hiroshima Univ., Japan
Volume :
1
fYear :
2001
fDate :
25-28 July 2001
Firstpage :
215
Abstract :
We deal with a transportation problem in a housing material manufacturer. The housing material manufacturer entrusts transportation of its products to two forwarding agents which handle regular transportation and small lot transportation. There are two objectives of the housing material manufacturer: one is to minimize the transportation cost and the other is to minimize the opportunity loss with respect to transportation time. Each of the two forwarding agents assigns drivers the transportation tasks so as to maximize its profit. We formulate the problem as a decentralized two-level integer programming problem and apply interactive fuzzy programming
Keywords :
fuzzy set theory; human resource management; integer programming; planning; resource allocation; transportation; decentralized two-level integer programming problem; driver assignment; forwarding agents; housing material manufacturer; interactive fuzzy programming; opportunity loss; profit maximization; regular transportation; small lot transportation; transportation cost; transportation problem; transportation time; Cost function; Delay effects; Functional programming; Linear programming; Materials requirements planning; Production facilities; Pulp manufacturing; Transportation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
IFSA World Congress and 20th NAFIPS International Conference, 2001. Joint 9th
Conference_Location :
Vancouver, BC
Print_ISBN :
0-7803-7078-3
Type :
conf
DOI :
10.1109/NAFIPS.2001.944254
Filename :
944254
Link To Document :
بازگشت