DocumentCode :
1753818
Title :
Research on Moisture Load and Pre-Dehumidification Time of Capillary Pipe Plane Radiation Air-Conditioning System
Author :
Sun, Juanjuan ; Liu, Xuelai ; Li, Yongan
Author_Institution :
Sch. of Thermal Energy Eng., Shandong Jianzhu Univ., Jinan, China
fYear :
2011
fDate :
25-28 March 2011
Firstpage :
1
Lastpage :
4
Abstract :
The space moisture load is mainly from human, open wide water, and plants in office buildings. Based on the pollutants general ventilation equation and energy conservation, considers indoor temperature and humidity ratio dynamic formula in fresh air start-up stage. According to the weather parameter of Jinan, calculated fresh air pre-dehumidification time, considers when fresh air is 1.3 times of meeting personnel and health requirements, it can control on 30 minutes.
Keywords :
air conditioning; energy conservation; pipes; capillary pipe plane radiation air-conditioning system; energy conservation; fresh air pre-dehumidification; humidity ratio dynamic formula; indoor temperature; space moisture load; ventilation equation; Buildings; Equations; Humans; Humidity; Mathematical model; Moisture; Ventilation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power and Energy Engineering Conference (APPEEC), 2011 Asia-Pacific
Conference_Location :
Wuhan
ISSN :
2157-4839
Print_ISBN :
978-1-4244-6253-7
Type :
conf
DOI :
10.1109/APPEEC.2011.5748840
Filename :
5748840
Link To Document :
بازگشت