DocumentCode :
1753931
Title :
Enhance transfer performance for high throughput tools by control scenario
Author :
Chen, Yu-Jen ; Lo, Hsi-Lo ; Pan, Cheng-Chung ; Chan, Nian-Wei
Author_Institution :
Rexchip Electron. Corp., Taichung, Taiwan
fYear :
2010
fDate :
18-20 Oct. 2010
Firstpage :
1
Lastpage :
4
Abstract :
With the advance of semiconductor manufacturing technology, tools Process Time (PT) will become shorter and shorter. But Automated Material Handling System (AMHS) has throughput limitation to affect tool performance. It may directly make tools while idle for waiting FOUP transportation and indirectly affects how many tools to purchase in Fab. This problem often happens as short PT tools, (i.e. PT <; Transfer Time), single load port tools, and high throughput bay line with vehicle traffic jam, etc. In this paper, we present some approaches to improve it through shortening Transfer Time. After the simulation in real Fab, these approaches have been proven to increase 6~15% of high throughput tools utilization.
Keywords :
factory automation; machine tools; materials handling equipment; FOUP transportation; automated material handling system; enhance transfer performance; high throughput tools; real Fab; semiconductor manufacturing technology; throughput bay line; tool performance; tool process time; transfer time; vehicle traffic jam; Metrology; AMHS; high throughput; local buffer;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Semiconductor Manufacturing (ISSM), 2010 International Symposium on
Conference_Location :
Tokyo
ISSN :
1523-553X
Print_ISBN :
978-1-4577-0392-8
Electronic_ISBN :
1523-553X
Type :
conf
Filename :
5750197
Link To Document :
بازگشت