DocumentCode :
1753934
Title :
ISSM 2010 a high availability multi-layered MCS system
Author :
Lin, Chia-Yang ; Yeh, Ming-Tang ; Kuo, Chia-Cheng
Author_Institution :
Powerchip Technol. Corp., Hsinchu, Taiwan
fYear :
2010
fDate :
18-20 Oct. 2010
Firstpage :
1
Lastpage :
4
Abstract :
Due to the mass-production needs on Powerchip Technology Corporation, the output of equipments is running onto its maximum. Thus, in order to guarantee the delivering time, the transferring control systems around them (AMHS, MCS) are also required to be 100% uptime. For AMHS systems, which are collaborated by multiple similar subsystems, this goal can be easily reached. But for the MCS, which is a stand-alone system just like the MES, there is no easy way out. Therefore, a multiple-layered MCS system is been considered here. Aiming to ensure the constant running on most functions of MCS at all time and prevent any further controlling lost during the MCS hand over process.
Keywords :
integrated circuit manufacture; mass production; materials handling; multivariable control systems; ISSM 2010; Powerchip Technology Corporation; delivery time guarantee; high availability multilayered MCS system; mass production; material control system; transferring control system; Control systems; Databases; Driver circuits; Industries;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Semiconductor Manufacturing (ISSM), 2010 International Symposium on
Conference_Location :
Tokyo
ISSN :
1523-553X
Print_ISBN :
978-1-4577-0392-8
Electronic_ISBN :
1523-553X
Type :
conf
Filename :
5750200
Link To Document :
بازگشت