Title :
Long-term Optimal Scheduling of Cascade Hydropower Stations Using Fuzzy Multi-objective Dynamic Programming Approach
Author :
Luo, Peng ; Zhou, Jianzhong ; Qin, Hui ; Lu, Youlin
Author_Institution :
Coll. of Hydropower Eng., HuaZhong Univ. of Sci. & Technol., Wuhan, China
Abstract :
A multi-objective fuzzy dynamic programming model for Three Gorges cascaded hydropower is presented in this paper. Three Gorges cascaded hydropower is a multifunctional reservoir, and it plays a great role in power generation, shipping, ecology, etc. Many methods have being developed to solve the conflict among them. In this paper, we develop a single-objective fuzzy dynamic programming model firstly, then we extent the model to multi-objective fuzzy dynamic programming model. Considering the actual conditions of Three Gorges cascaded hydropower, we take maximization of Three Gorges reservoir´s power generation and minimization of Gezhouba reservoir´s surplus water as the two objectives, and the optimal problem is solved satisfactorily.
Keywords :
dynamic programming; fuzzy systems; hydroelectric power stations; power generation scheduling; Gezhouba reservoir; Three Gorges reservoir; fuzzy multiobjective dynamic programming approach; long-term optimal scheduling; multifunctional reservoir; power generation; single-objective fuzzy dynamic programming model; three Gorges cascade hydropower station; Biological system modeling; Dynamic programming; Heuristic algorithms; Hydroelectric power generation; Optimization; Reservoirs; Multi-objective; cascade hydropower; fuzzy approach;
Conference_Titel :
Intelligent Computation Technology and Automation (ICICTA), 2011 International Conference on
Conference_Location :
Shenzhen, Guangdong
Print_ISBN :
978-1-61284-289-9
DOI :
10.1109/ICICTA.2011.52