• DocumentCode
    175704
  • Title

    Analysis based on the shortest path method of equipment replacement

  • Author

    Zhao Ping ; Li Laifeng

  • Author_Institution
    Civil Eng. Coll., Xi´an Univ. of Archit. & Technol., Xi´an, China
  • fYear
    2014
  • fDate
    May 31 2014-June 2 2014
  • Firstpage
    962
  • Lastpage
    965
  • Abstract
    Equipment is the foundation and precondition of the survival of the enterprises, the advanced level and the update problem of which directly affect the enterprise´s survival and development, which also are paid more and more attention. Based on network model, this paper studied the update problem of the construction equipment, through changing the equipment update problem to the shortest path problem of graph theory, so as to solve the selection problem of equipment renewal scheme and ensure total cost of equipment replacement is the minimum in the service life. Compared to the traditional method of equipment renewal, this method possesses more intuitive. Through a instance analysis of concrete mixer truck in a construction enterprise, the paper proved and solved the method mentioned above and reached the optimal solution.
  • Keywords
    construction industry; graph theory; life cycle costing; maintenance engineering; production equipment; concrete mixer truck; construction enterprise; construction equipment; enterprise development; enterprise survival; equipment renewal scheme; equipment replacement; equipment update problem; graph theory; service life; shortest path method; Concrete; Dynamic programming; Economics; Educational institutions; Maintenance engineering; Mixers; Prototypes; Equipment Replacement; Network Model; Shortest Path; the Optimal Solution;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control and Decision Conference (2014 CCDC), The 26th Chinese
  • Conference_Location
    Changsha
  • Print_ISBN
    978-1-4799-3707-3
  • Type

    conf

  • DOI
    10.1109/CCDC.2014.6852302
  • Filename
    6852302