DocumentCode
1757318
Title
Cellular Production Lines With Asymptotically Reliable Bernoulli Machines: Lead Time Analysis and Control
Author
Meerkov, Semyon M. ; Chao-Bo Yan
Author_Institution
Dept. of Electr. Eng. & Comput. Sci., Univ. of Michigan, Ann Arbor, MI, USA
Volume
12
Issue
2
fYear
2015
fDate
42095
Firstpage
764
Lastpage
768
Abstract
Cellular lines are production systems consisting of cells comprised of machines performing similar operations. These systems are notorious for having excessively long lead time (LT) that are often an order of magnitude longer than the total processing time by all machines in the system. The main goal of this paper is to carry out an analytical investigation of this phenomenon and offer methods for its alleviation. To accomplish this, we develop a technique for performance evaluation of cellular lines with asymptotically reliable Bernoulli machines and use it for analysis and control of LT.
Keywords
cellular manufacturing; lead time reduction; asymptotic reliable Bernoulli machines; cellular production lines; lead time analysis; lead time control; Manufacturing systems; Modeling; Raw materials; Robustness; Asymptotically reliable Bernoulli machines; cellular lines; lead time; open- and closed-loop release control; production systems;
fLanguage
English
Journal_Title
Automation Science and Engineering, IEEE Transactions on
Publisher
ieee
ISSN
1545-5955
Type
jour
DOI
10.1109/TASE.2014.2330793
Filename
6853412
Link To Document