• DocumentCode
    1757318
  • Title

    Cellular Production Lines With Asymptotically Reliable Bernoulli Machines: Lead Time Analysis and Control

  • Author

    Meerkov, Semyon M. ; Chao-Bo Yan

  • Author_Institution
    Dept. of Electr. Eng. & Comput. Sci., Univ. of Michigan, Ann Arbor, MI, USA
  • Volume
    12
  • Issue
    2
  • fYear
    2015
  • fDate
    42095
  • Firstpage
    764
  • Lastpage
    768
  • Abstract
    Cellular lines are production systems consisting of cells comprised of machines performing similar operations. These systems are notorious for having excessively long lead time (LT) that are often an order of magnitude longer than the total processing time by all machines in the system. The main goal of this paper is to carry out an analytical investigation of this phenomenon and offer methods for its alleviation. To accomplish this, we develop a technique for performance evaluation of cellular lines with asymptotically reliable Bernoulli machines and use it for analysis and control of LT.
  • Keywords
    cellular manufacturing; lead time reduction; asymptotic reliable Bernoulli machines; cellular production lines; lead time analysis; lead time control; Manufacturing systems; Modeling; Raw materials; Robustness; Asymptotically reliable Bernoulli machines; cellular lines; lead time; open- and closed-loop release control; production systems;
  • fLanguage
    English
  • Journal_Title
    Automation Science and Engineering, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    1545-5955
  • Type

    jour

  • DOI
    10.1109/TASE.2014.2330793
  • Filename
    6853412