    Study of the location of TCSC for improving ATC considering N-1 security constraints

  • Author

    Wenjie Tang ; Wenjing Pan ; Kaifeng Zhang ; Cheng Liu

  • Author_Institution
    Sch. of Autom., Southeast Univ., Nanjing, China
  • fYear
    2014
  • fDate
    May 31 2014-June 2 2014
  • Firstpage
    2166
  • Lastpage
    2170
  • Abstract
    With the increasing demand of electric power, transmission congestion becomes a popular phenomenon in power systems. In order to improve the ATC (Available Transfer Capability) between buses of the network, this paper proposes a location method of TCSC in power grid. Power transfer distribution factor and line outage distribution factor are used to build the mathematical model of ATC considering the N-1 security constraints. Meanwhile, the genetic algorithm is used to calculate the location and the capacity of TCSC. The proposed method is applied to the IEEE 14-bus system. The results show that this method can improve the ATC of power systems with TCSC obviously.
  • Keywords
    flexible AC transmission systems; genetic algorithms; power distribution; power grids; power system security; power transmission lines; power transmission reliability; ATC; IEEE 14-bus system; N-1 security constraints; TCSC location; available transfer capability; electric power demand; genetic algorithm; line outage distribution factor; mathematical model; power grid; power transfer distribution factor; transmission congestion; Genetic algorithms; Manganese; Power capacitors; Power system stability; Security; Thyristors; ATC; Genetic Algorithms; Line Outage Distribution Factor; Power Transfer Distribution Factor; TCSC;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control and Decision Conference (2014 CCDC), The 26th Chinese
  • Conference_Location
    Changsha
  • Print_ISBN
    978-1-4799-3707-3
  • Type

    conf

  • DOI
    10.1109/CCDC.2014.6852526
  • Filename
    6852526