DocumentCode :
176270
Title :
Resource conflict resolution method for software projects using fuzzy critical chain
Author :
Yan Guo ; Chao Dong
Author_Institution :
Ningbo Inst. of Technol., Zhejiang Univ., Ningbo, China
fYear :
2014
fDate :
May 31 2014-June 2 2014
Firstpage :
2554
Lastpage :
2559
Abstract :
This paper develops a fuzzy critical chain method for resource conflict resolution in software projects scheduling. The method consists of developing a novel fuzzy estimation technique based on Delphi for activity duration, and adding the capacity constraint buffer between neighboring projects to deal with resource conflict. The size of the capacity constraint buffer is determined by computation with the complexity, resource tightness and safety time of the capacity constraint activity. Finally, the result of a numerical example shows that this method is able to provide the sufficient staggered time for the whole projects.
Keywords :
computational complexity; fuzzy set theory; project management; resource allocation; software management; Delphi; activity duration; capacity constraint activity safety time; capacity constraint buffer; computational complexity; fuzzy critical chain; fuzzy estimation technique; resource conflict resolution method; resource tightness; software projects scheduling; Complexity theory; Estimation; Project management; Safety; Scheduling; Software; Uncertainty; Critical chain project management; Estimation method for activity duration; Fuzzy theory; Resource conflict resolution;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Control and Decision Conference (2014 CCDC), The 26th Chinese
Conference_Location :
Changsha
Print_ISBN :
978-1-4799-3707-3
Type :
conf
DOI :
10.1109/CCDC.2014.6852604
Filename :
6852604
Link To Document :
بازگشت