• DocumentCode
    1762862
  • Title

    JT-60SA Construction Status

  • Author

    Spears, W.R.

  • Author_Institution
    F4E, Garching Antenna, Garching, Germany
  • Volume
    42
  • Issue
    3
  • fYear
    2014
  • fDate
    41699
  • Firstpage
    427
  • Lastpage
    431
  • Abstract
    The construction of the JT-60SA tokamak is one of the three projects of the Broader Approach activities being undertaken jointly by Japan and Europe. The construction of the new load assembly and the refurbishment of some reutilized equipment from JT-60U is now well underway, and is on track to produce its first plasma in March 2019. As a satellite tokamak of ITER, and being superconducting, JT-60SA has the objective of supporting ITER in its operation as well as complementing ITER in the definition of the design basis of DEMO, particularly to identify the best ways to extend plasma pulse lengths toward steady state.
  • Keywords
    Tokamak devices; fusion reactor design; plasma toroidal confinement; AD 2019 03; DEMO design basis; Europe; ITER satellite tokamak; JT-60SA construction status; JT-60SA tokamak construction; Japan; broader approach activities; plasma pulse lengths; Assembly; Coils; Europe; Heating; Magnetic noise; Magnetic shielding; Plasmas; Experiment; nuclear fusion; overview;
  • fLanguage
    English
  • Journal_Title
    Plasma Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0093-3813
  • Type

    jour

  • DOI
    10.1109/TPS.2014.2302320
  • Filename
    6737297