DocumentCode :
1762862
Title :
JT-60SA Construction Status
Author :
Spears, W.R.
Author_Institution :
F4E, Garching Antenna, Garching, Germany
Volume :
42
Issue :
3
fYear :
2014
fDate :
41699
Firstpage :
427
Lastpage :
431
Abstract :
The construction of the JT-60SA tokamak is one of the three projects of the Broader Approach activities being undertaken jointly by Japan and Europe. The construction of the new load assembly and the refurbishment of some reutilized equipment from JT-60U is now well underway, and is on track to produce its first plasma in March 2019. As a satellite tokamak of ITER, and being superconducting, JT-60SA has the objective of supporting ITER in its operation as well as complementing ITER in the definition of the design basis of DEMO, particularly to identify the best ways to extend plasma pulse lengths toward steady state.
Keywords :
Tokamak devices; fusion reactor design; plasma toroidal confinement; AD 2019 03; DEMO design basis; Europe; ITER satellite tokamak; JT-60SA construction status; JT-60SA tokamak construction; Japan; broader approach activities; plasma pulse lengths; Assembly; Coils; Europe; Heating; Magnetic noise; Magnetic shielding; Plasmas; Experiment; nuclear fusion; overview;
fLanguage :
English
Journal_Title :
Plasma Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0093-3813
Type :
jour
DOI :
10.1109/TPS.2014.2302320
Filename :
6737297
Link To Document :
بازگشت