• DocumentCode
    176313
  • Title

    Multi-vehicle coordination and flexible scheduling based on Simulated Annealing Algorithm

  • Author

    Cheng Zhu ; Luohao Tang ; Weiming Zhang

  • Author_Institution
    Sci. & Technol. on Inf. Syst. Eng. Lab., Nat. Univ. of Defense Technol., Changsha, China
  • fYear
    2014
  • fDate
    May 31 2014-June 2 2014
  • Firstpage
    2686
  • Lastpage
    2691
  • Abstract
    In this paper, we consider a multi-vehicle coordination problem (MVCP), in which heterogeneous vehicles with different resources cooperate to accomplish a set of tasks. The distinct characters of MVCP are the duration of each task may vary within a given interval, and the objective is to allocate and schedule the vehicles to maximize the total time slacks between tasks given the deadline. The time slack represents the fleet´s capability to tolerate the temporal uncertainty. A model for MVCP is built and a solving method based on the Simulated Annealing Algorithm is proposed. The result of experiments shows the efficiency of the method.
  • Keywords
    scheduling; simulated annealing; vehicle routing; MVCP; flexible scheduling; multivehicle coordination problem; simulated annealing; temporal uncertainty; time slack; Algorithm design and analysis; Heuristic algorithms; Resource management; Routing; Schedules; Simulated annealing; Vehicles; Simulated Annealing Algorithm; multi-vehicle coordination; varying duration;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control and Decision Conference (2014 CCDC), The 26th Chinese
  • Conference_Location
    Changsha
  • Print_ISBN
    978-1-4799-3707-3
  • Type

    conf

  • DOI
    10.1109/CCDC.2014.6852627
  • Filename
    6852627