DocumentCode
176313
Title
Multi-vehicle coordination and flexible scheduling based on Simulated Annealing Algorithm
Author
Cheng Zhu ; Luohao Tang ; Weiming Zhang
Author_Institution
Sci. & Technol. on Inf. Syst. Eng. Lab., Nat. Univ. of Defense Technol., Changsha, China
fYear
2014
fDate
May 31 2014-June 2 2014
Firstpage
2686
Lastpage
2691
Abstract
In this paper, we consider a multi-vehicle coordination problem (MVCP), in which heterogeneous vehicles with different resources cooperate to accomplish a set of tasks. The distinct characters of MVCP are the duration of each task may vary within a given interval, and the objective is to allocate and schedule the vehicles to maximize the total time slacks between tasks given the deadline. The time slack represents the fleet´s capability to tolerate the temporal uncertainty. A model for MVCP is built and a solving method based on the Simulated Annealing Algorithm is proposed. The result of experiments shows the efficiency of the method.
Keywords
scheduling; simulated annealing; vehicle routing; MVCP; flexible scheduling; multivehicle coordination problem; simulated annealing; temporal uncertainty; time slack; Algorithm design and analysis; Heuristic algorithms; Resource management; Routing; Schedules; Simulated annealing; Vehicles; Simulated Annealing Algorithm; multi-vehicle coordination; varying duration;
fLanguage
English
Publisher
ieee
Conference_Titel
Control and Decision Conference (2014 CCDC), The 26th Chinese
Conference_Location
Changsha
Print_ISBN
978-1-4799-3707-3
Type
conf
DOI
10.1109/CCDC.2014.6852627
Filename
6852627
Link To Document