• DocumentCode
    176518
  • Title

    Coordinative scheduling problem of single machine manufacturing and delivery with due date windows

  • Author

    Pang Hali

  • Author_Institution
    Coll. of Inf. Sci. & Technol., Northeastern Univ., Shenyang, China
  • fYear
    2014
  • fDate
    May 31 2014-June 2 2014
  • Firstpage
    3229
  • Lastpage
    3234
  • Abstract
    Considering capacity of transportation measured by space and delivery route constraints, a coordinative scheduling problem of single machine manufacturing and multiple customer delivery with due date windows was studied in this paper. A bi-level mathematic programming model was presented, and a PSO algorithm is proposed to solve the problem. Some computing tests were performed to compare the different algorithm strategies.
  • Keywords
    goods distribution; mathematical programming; particle swarm optimisation; single machine scheduling; transportation; PSO algorithm; bilevel mathematic programming model; coordinative scheduling problem; delivery route constraint; due date windows; multiple customer delivery; single machine manufacturing; space constraint; transportation capacity; Job shop scheduling; Manufacturing; Mathematical model; Single machine scheduling; Supply chains; Vehicles; Coordinative scheduling; Due date window; Manufacturing and delivery; PSO algorithm;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control and Decision Conference (2014 CCDC), The 26th Chinese
  • Conference_Location
    Changsha
  • Print_ISBN
    978-1-4799-3707-3
  • Type

    conf

  • DOI
    10.1109/CCDC.2014.6852731
  • Filename
    6852731