DocumentCode :
176614
Title :
Research on evaluation of engineering changes under bill of quantities mode
Author :
Tao Ding ; Ling Zhang ; Zhenshui Wang
Author_Institution :
Capital Constr. Div., Beijing Polytech., Beijing, China
fYear :
2014
fDate :
29-30 Sept. 2014
Firstpage :
521
Lastpage :
523
Abstract :
Engineering changes are not just critical evidences for engineering settlement between the two contracting parties in engineering construction, but also involve in the reallocation of responsibilities and risks such as laws, regulations, structural safety, technical standards, engineering scope, government acceptance, government supervision on quality and safety, health and epidemic prevention, planning, quality standards and fire control, etc. The feasibility evaluation on engineering changes under bill of quantities mode can better reflect its importance and necessity. Based on summary and review of a large number of examples of engineering changes, the thesis puts forward evaluation ideas and suggestions for engineering changes under bill of quantities mode, and hopes to provide certain instructions for management of subsequent engineering changes in the future.
Keywords :
bills of materials; construction; management of change; bill-of-quantities mode; contracting party; engineering change evaluation; engineering change management; engineering construction; engineering settlement; Energy measurement; Fires; Government; Materials; Pricing; Standards; bill of quantities; costs for measures; engineering change;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Advanced Research and Technology in Industry Applications (WARTIA), 2014 IEEE Workshop on
Conference_Location :
Ottawa, ON
Type :
conf
DOI :
10.1109/WARTIA.2014.6976311
Filename :
6976311
Link To Document :
بازگشت