• DocumentCode
    176661
  • Title

    Research on the emergence mechanism of Last Planner System of lean construction

  • Author

    Zhu Kongguo

  • Author_Institution
    Libr. of Shandong Youth Univ. of Political Sci., Jinan, China
  • fYear
    2014
  • fDate
    May 31 2014-June 2 2014
  • Firstpage
    3643
  • Lastpage
    3646
  • Abstract
    The Last Planner System is a very important and systematic method that influences the achievement of lean construction. With the theory of emergence science, this paper analyzed the emergence mechanism of the last planner system from the perspective of group decision-making, information change and self-organization; then, how to realize the potencies of the last planner system so as to attain much emergence was discussed.
  • Keywords
    construction industry; decision making; lean production; production planning; emergence science; group decision making; information change; last planner system; lean construction; self organization; Decision making; Organizations; Planning; Process control; Production; Project management; Reliability; Complex System; Emergent Property; Group Decision-Making; Last Planner System; Lean Construction;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control and Decision Conference (2014 CCDC), The 26th Chinese
  • Conference_Location
    Changsha
  • Print_ISBN
    978-1-4799-3707-3
  • Type

    conf

  • DOI
    10.1109/CCDC.2014.6852812
  • Filename
    6852812