DocumentCode
176661
Title
Research on the emergence mechanism of Last Planner System of lean construction
Author
Zhu Kongguo
Author_Institution
Libr. of Shandong Youth Univ. of Political Sci., Jinan, China
fYear
2014
fDate
May 31 2014-June 2 2014
Firstpage
3643
Lastpage
3646
Abstract
The Last Planner System is a very important and systematic method that influences the achievement of lean construction. With the theory of emergence science, this paper analyzed the emergence mechanism of the last planner system from the perspective of group decision-making, information change and self-organization; then, how to realize the potencies of the last planner system so as to attain much emergence was discussed.
Keywords
construction industry; decision making; lean production; production planning; emergence science; group decision making; information change; last planner system; lean construction; self organization; Decision making; Organizations; Planning; Process control; Production; Project management; Reliability; Complex System; Emergent Property; Group Decision-Making; Last Planner System; Lean Construction;
fLanguage
English
Publisher
ieee
Conference_Titel
Control and Decision Conference (2014 CCDC), The 26th Chinese
Conference_Location
Changsha
Print_ISBN
978-1-4799-3707-3
Type
conf
DOI
10.1109/CCDC.2014.6852812
Filename
6852812
Link To Document