• DocumentCode
    177116
  • Title

    An approach with decomposition on time windows for resource-constrained project scheduling

  • Author

    Jing Tian ; Zhenyuan Liu ; Wenmin Yu

  • Author_Institution
    Coll. of Autom., Huazhong Univ. of Sci. & Technol., Wuhan, China
  • fYear
    2014
  • fDate
    May 31 2014-June 2 2014
  • Firstpage
    4897
  • Lastpage
    4903
  • Abstract
    An approach with decomposition on time windows is proposed to solve resource-constrained project scheduling problem (RCPSP) in this paper. This approach is to decompose the feasible space calculated by CPM of the original problem into some subspaces, which are searched using some schedule schema. Double justification is also performed in the search to improve the results. The results of experiments conducted on PSPLIB show the proposed method is effective and efficient.
  • Keywords
    project management; scheduling; RCPSP; decomposition on time windows; double justification; resource-constrained project scheduling problem; schedule schema; Algorithm design and analysis; Educational institutions; Heuristic algorithms; Processor scheduling; Schedules; Scheduling; Search problems; Decomposition on Time Windows; Double Justification; Project Scheduling; Random Sampling; Scheduling Schema;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control and Decision Conference (2014 CCDC), The 26th Chinese
  • Conference_Location
    Changsha
  • Print_ISBN
    978-1-4799-3707-3
  • Type

    conf

  • DOI
    10.1109/CCDC.2014.6853050
  • Filename
    6853050