Title :
An approach with decomposition on time windows for resource-constrained project scheduling
Author :
Jing Tian ; Zhenyuan Liu ; Wenmin Yu
Author_Institution :
Coll. of Autom., Huazhong Univ. of Sci. & Technol., Wuhan, China
fDate :
May 31 2014-June 2 2014
Abstract :
An approach with decomposition on time windows is proposed to solve resource-constrained project scheduling problem (RCPSP) in this paper. This approach is to decompose the feasible space calculated by CPM of the original problem into some subspaces, which are searched using some schedule schema. Double justification is also performed in the search to improve the results. The results of experiments conducted on PSPLIB show the proposed method is effective and efficient.
Keywords :
project management; scheduling; RCPSP; decomposition on time windows; double justification; resource-constrained project scheduling problem; schedule schema; Algorithm design and analysis; Educational institutions; Heuristic algorithms; Processor scheduling; Schedules; Scheduling; Search problems; Decomposition on Time Windows; Double Justification; Project Scheduling; Random Sampling; Scheduling Schema;
Conference_Titel :
Control and Decision Conference (2014 CCDC), The 26th Chinese
Conference_Location :
Changsha
Print_ISBN :
978-1-4799-3707-3
DOI :
10.1109/CCDC.2014.6853050