Title :
Load restoration optimization during last stage of network reconfiguration
Author :
Hanbing Qu ; Maolin Yin ; Shan Lin
Author_Institution :
Shandong Jinan Power Supply Co., Jinan, China
Abstract :
During last stage of network reconfiguration after major blackout, loads should be picked up in sequence with considering certain constraints, which is a multi-constraint, non-linearity, integer programming problem. This paper proposes a combinatorial optimization model with considering the sequencing problem of load pickup, in which effects of pickup sequence are taken into consideration in both objective function and constraints. As the large optimization scale of restorable loads during last stage of network reconfiguration, a new adaptive particle swarm optimization algorithm is adopted to solve the proposed model. Case studies performed on the actual Shandong power system demonstrate that the proposed model effectively reflects sequencing problem and the adopted algorithm can satisfy the practical requirement on computation speed.
Keywords :
integer programming; particle swarm optimisation; power system restoration; Shandong power system; adaptive particle swarm optimization algorithm; combinatorial optimization model; integer programming problem; load pick up sequencing problem; load restoration optimization; network reconfiguration; Abstracts; Electricity; Load modeling; Mathematical model; Substations; adaptive particle swarm optimization algorithm; combinatorial optimization; load restoration; power system restoration; sequencing problem;
Conference_Titel :
Electricity Distribution (CICED), 2014 China International Conference on
Conference_Location :
Shenzhen
DOI :
10.1109/CICED.2014.6991870