Title :
Under the condition of uncertainty between the regional power grids self adjust surplus and deficiency of research model and the optimization of electricity trading and decision
Author :
Shimming Bai ; Daqiang Xiao ; Jianhua Yang ; Ze Ye
Author_Institution :
Sub-Center Huazhong Electr. Power Trading of State Grid, Wuhan, China
Abstract :
China´s regional power grid trading institutions undertake the plan of implementation of various provisions of the inter provincial electricity trade promote and maintain the remaining places in the regional electricity transactions provincial power supply and demand balance tasks. There are two main problems existing regional grid electricity trading range between introspection. (1) the lack of objective function with respect to trading decisions, mistake the power supply and demand balance this constraint conditions as the target; (2) the lack of impact analysis and optimization prior trading scheme for uncertainties. This paper summarizes the current practices and policy requirements of the regional grid electricity transaction, take inter provincial electricity trade as decision variables, the province and the provincial or regional power balance between transmission constraints as constraint conditions, establish a regional power grid intrapersonal power transaction optimization decision model. Papers in the five typical scenarios of water runoff uncertainty and market demand uncertainty conducted a simulation analysis. The results show that: in an uncertain situation. The use of the model to optimize trading decisions can only guarantee the provinces after power balance in the region, but also makes the regional power grid optimization benefits than do the benefits.
Keywords :
power grids; power markets; supply and demand; China regional power grid trading institutions; electricity trading optimization; inter provincial electricity trade; market demand uncertainty; optimization prior trading scheme; provincial power supply and demand balance tasks; regional grid electricity transactions; regional power grid intrapersonal power transaction optimization decision model; regional power grid self adjust deficiency; regional power grid self adjust surplus; research model; transmission constraints; water runoff uncertainty; Companies; Electricity; Hydroelectric power generation; Optimization; Power grids; Power markets; Uncertainty; Power balance; Uncertainty; adjust surplus and deficiency of power; regional power grid;
Conference_Titel :
Power System Technology (POWERCON), 2014 International Conference on
Conference_Location :
Chengdu
DOI :
10.1109/POWERCON.2014.6993968