DocumentCode
1778054
Title
Distribution system programming method with high power supply quality considering the customer requirements
Author
Chen Qing-fang ; Yang Shao-Zhi ; Hu Zheng
Author_Institution
Liangshan Power Supply Co., Sichuan Electr. Power Co., Liangshan, China
fYear
2014
fDate
20-22 Oct. 2014
Firstpage
1652
Lastpage
1656
Abstract
In the proposed method, the requirements of different customer connected to the distribution system are determined and measured by customer satisfaction degree, where, the direct and indirect economic losses caused by the power quality disturbances occurring in the distribution system can be determined by the customer satisfaction degree. By the help of customer losses, a high supply quality system programming model and method are developed. Considering the compatibility between power quality disturbances caused by distribution system fault and customer requirements, maximum entropy method is used. The proposed method is validated by a test system. The results have shown that the proposed method can insure the power supply quality with appropriate cost.
Keywords
customer satisfaction; distribution networks; power supply quality; customer requirements; customer satisfaction degree; distribution system fault; distribution system programming method; high supply quality system programming model; power quality disturbances; power supply quality; Economics; Electric potential; Planning; Power quality; Programming; Voltage fluctuations; Customer Requirement; Maximum Entropy; Power Supply Quality; Programming Method; Satisfaction Degree;
fLanguage
English
Publisher
ieee
Conference_Titel
Power System Technology (POWERCON), 2014 International Conference on
Conference_Location
Chengdu
Type
conf
DOI
10.1109/POWERCON.2014.6993969
Filename
6993969
Link To Document