DocumentCode
1781548
Title
Simple constructive heuristics for the Distributed Assembly Permutation Flowshop Scheduling Problem with sequence dependent setup times
Author
Hatami, Sara ; Ruiz, Ricardo ; Andres-Romano, Carlos
Author_Institution
Dept. de Organizacion de Empresas, Univ. Politec. de Valencia, València, Spain
fYear
2014
fDate
3-5 Nov. 2014
Abstract
In this paper we consider a realistic production setting, referred to the Distributed Assembly Permutation Flowshop Scheduling Problem or DAPFSP in short. The problem consists of two stages, production and assembly. The paper is an extension of the recent work by Hatami et al. [6], that the additional consideration of sequence-dependent setup times (SDST) is added on both production and assembly stages. The resulting problem is very close to the reality of multi-factory scheduling. The production stage as the first stage is composed of f identical flowshop production factories where each factory is a flowshop that produce the different jobs. In the assembly stage, all produced jobs are assembled into final products. The objective is to minimize the overall makespan. As this problem is known to be NP-hard, we propose two simple constructive heuristics to solve the problem. In this paper we detail the proposed heuristics and carry out a comprehensive computational and statistical experiment to analyze their performance.
Keywords
flow shop scheduling; optimisation; production management; DAPFSP; NP-hard problem; SDST; constructive heuristics; distributed assembly permutation flowshop scheduling problem; multifactory scheduling; production stages; sequence dependent setup times; Assembly; Job shop scheduling; Processor scheduling; Production facilities; Sorting;
fLanguage
English
Publisher
ieee
Conference_Titel
Control, Decision and Information Technologies (CoDIT), 2014 International Conference on
Conference_Location
Metz
Type
conf
DOI
10.1109/CoDIT.2014.6996861
Filename
6996861
Link To Document