DocumentCode
1782921
Title
Max-Min Ant System to solve the software project scheduling problem
Author
Crawford, Broderick ; Soto, R. ; Johnson, Francis ; Paredes, Ferran ; Olivares Suarez, Miguel
Author_Institution
Pontificia Univ. Catolica de Valparaiso, Valparaiso, Chile
fYear
2014
fDate
18-21 June 2014
Firstpage
1
Lastpage
4
Abstract
The Software Project Scheduling Problem is a special case of project scheduling problems. This problem consists in assigning workers with different skills, to a series of tasks in a software project so that the project is completed in the shortest time and the lowest cost possible. In addition, this allocation must meet the constraints of skill required for each task and the precedence constraints between tasks. The solution to this problem is presented using the Max - Min Ant System algorithm and the Hypercube framework. Two heuristics capable of guiding the algorithm to find better solutions are proposed. Experimental results are presented and compared with other techniques of resolution, showing an improvement by implementing our proposal.
Keywords
ant colony optimisation; hypercube networks; minimax techniques; project management; scheduling; software management; hypercube framework; max-min ant system; precedence constraints; skill constraints; software project scheduling problem; Abstracts; Ant colony optimization; Computers; Hypercubes; Silicon; Software; Software algorithms; Hypercube; Max-Min Ant System; Metaheuristics; Software Project Scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Systems and Technologies (CISTI), 2014 9th Iberian Conference on
Conference_Location
Barcelona
Type
conf
DOI
10.1109/CISTI.2014.6877091
Filename
6877091
Link To Document