• DocumentCode
    179125
  • Title

    Based on Statistical Analysis of Construction and Operation Status of Urban Sewage Treatment Plants in Guizhou Province

  • Author

    Lu Tianyou ; Tang Zhongde ; Yao Xiaoyuan ; Cheng Guanwen ; Wu Qiongfang

  • Author_Institution
    Guizhou Univ., Guiyang, China
  • fYear
    2014
  • fDate
    15-16 June 2014
  • Firstpage
    243
  • Lastpage
    246
  • Abstract
    Guizhou has built 98 urban sewage treatment plants which main treatment process were mature technologies with nitrogen and phosphorus removal capabilities such as oxidation ditch, A/O process and SBR process and its improvement in the "Eleventh Five-year Plan" period. In the full completion of the national "Eleventh Five-Year" pollutant emission reduction task there are some problems of plants like lagging pipeline construction and construction of small-scale. Therefore, it is important that strengthen the upgrading of sewage treatment technology and facilities, enhance professional skills training of technical staffs in the "Twelfth Five-Year Plan" Period.
  • Keywords
    maintenance engineering; pollution control; sewage treatment; statistical analysis; Guizhou province; SBR process; facilities upgrading; nitrogen removal; oxidation ditch; phosphorus removal; pollutant emission reduction; statistical analysis; urban sewage treatment plant construction; Cities and towns; Energy consumption; Investment; Microwave theory and techniques; Oxidation; Rivers; Sewage treatment; Existing problems; process technology; running effect; urban sewage treatment plants;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Systems Design and Engineering Applications (ISDEA), 2014 Fifth International Conference on
  • Conference_Location
    Hunan
  • Print_ISBN
    978-1-4799-4262-6
  • Type

    conf

  • DOI
    10.1109/ISDEA.2014.60
  • Filename
    6977588