DocumentCode
179125
Title
Based on Statistical Analysis of Construction and Operation Status of Urban Sewage Treatment Plants in Guizhou Province
Author
Lu Tianyou ; Tang Zhongde ; Yao Xiaoyuan ; Cheng Guanwen ; Wu Qiongfang
Author_Institution
Guizhou Univ., Guiyang, China
fYear
2014
fDate
15-16 June 2014
Firstpage
243
Lastpage
246
Abstract
Guizhou has built 98 urban sewage treatment plants which main treatment process were mature technologies with nitrogen and phosphorus removal capabilities such as oxidation ditch, A/O process and SBR process and its improvement in the "Eleventh Five-year Plan" period. In the full completion of the national "Eleventh Five-Year" pollutant emission reduction task there are some problems of plants like lagging pipeline construction and construction of small-scale. Therefore, it is important that strengthen the upgrading of sewage treatment technology and facilities, enhance professional skills training of technical staffs in the "Twelfth Five-Year Plan" Period.
Keywords
maintenance engineering; pollution control; sewage treatment; statistical analysis; Guizhou province; SBR process; facilities upgrading; nitrogen removal; oxidation ditch; phosphorus removal; pollutant emission reduction; statistical analysis; urban sewage treatment plant construction; Cities and towns; Energy consumption; Investment; Microwave theory and techniques; Oxidation; Rivers; Sewage treatment; Existing problems; process technology; running effect; urban sewage treatment plants;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent Systems Design and Engineering Applications (ISDEA), 2014 Fifth International Conference on
Conference_Location
Hunan
Print_ISBN
978-1-4799-4262-6
Type
conf
DOI
10.1109/ISDEA.2014.60
Filename
6977588
Link To Document