DocumentCode :
1794586
Title :
A two-phase heuristic for full truckload routing and scheduling with split delivery and resource synchronization in public works
Author :
Grimault, Axel ; Lehuede, Fabien ; Bostel, Nathalie
Author_Institution :
Ecole des Mines de Nantes, LUNAM Univ., Nantes, France
fYear :
2014
fDate :
5-7 June 2014
Firstpage :
57
Lastpage :
61
Abstract :
This paper presents a two-phase method to solve a routing and scheduling problem that arises in public works. In this problem, the quantity of demands generally exceeds the capacity of a truck. As a result, demands have to be split into full truckloads, taking into account the various capacities in the heterogeneous fleet of vehicles that perform the transportation. Full truckload routes have to be designed and scheduled according to construction or loading constraints on pickup and delivery sites. In the first phase, we propose a linear program to split demands into full truckload requests. The second phase is a heuristic that solves a heterogeneous full truckload pickup and delivery problem with time windows and resource synchronization. The method is evaluated on instances from a real case study.
Keywords :
linear programming; scheduling; synchronisation; vehicle routing; construction constraint; full truckload requests; full truckload routing; full truckload scheduling; heterogeneous full truckload pickup-and-delivery problem; heterogeneous vehicle fleet; linear program; loading constraint; public works; resource synchronization; split delivery; time windows; two-phase heuristic method; Asphalt; Concrete; Routing; Synchronization; Vehicles; Zirconium;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Logistics and Operations Management (GOL), 2014 International Conference on
Conference_Location :
Rabat
Print_ISBN :
978-1-4799-4651-8
Type :
conf
DOI :
10.1109/GOL.2014.6887418
Filename :
6887418
Link To Document :
بازگشت