DocumentCode
1794625
Title
Bi-objective Operating Theater scheduling case of the paediatric hospital of Oran
Author
Dekhici, Latifa ; Belkadi, Khaled
Author_Institution
Dept. of Comput. Sci., Univ. Mohamed Boudiaf, Oran, Algeria
fYear
2014
fDate
5-7 June 2014
Firstpage
181
Lastpage
187
Abstract
In this paper, we propose a bi- objective Operating Theater scheduling subject to order and assignment constraints. The first objective is to minimize the total time operating theater opening or the makespan. The second is the maximum constraints satisfaction. The problem is a two stage hybrid flow shop with blocking. We compare the firefly algorithm, bats algorithm, particles swarm optimization and local search. In addition to the care specific quantitative and qualitative parameters, we use the average deviation from the lower bound to confirm the effectiveness of the methods. The implementation is done on the operating theater of the paediatric hospital of Oran when it is properly and improperly sized.
Keywords
flow shop scheduling; hospitals; particle swarm optimisation; search problems; Oran; assignment constraints; bats algorithm; bi-objective operating theater scheduling; firefly algorithm; local search; maximum constraints satisfaction; paediatric hospital; particle swarm optimization; total time operating theater opening; two stage hybrid flow shop with blocking; Job shop scheduling; Manganese; Parallel machines; Particle swarm optimization; Pediatrics; Planning; Surgery; bat algorithm PSO; bi-objective scheduling; constraint; firefly algorithm; hybrid flow shop with blocking; makespan; operating theater;
fLanguage
English
Publisher
ieee
Conference_Titel
Logistics and Operations Management (GOL), 2014 International Conference on
Conference_Location
Rabat
Print_ISBN
978-1-4799-4651-8
Type
conf
DOI
10.1109/GOL.2014.6887438
Filename
6887438
Link To Document