DocumentCode :
1795385
Title :
A study of resource constraint project scheduling problem for energy saving
Author :
Miyamoto, Takahiro ; Mori, Kazuo ; Kitamura, S. ; Izui, Yoshio
Author_Institution :
Grad. Sch. of Eng., Osaka Univ., Suita, Japan
fYear :
2014
fDate :
11-13 July 2014
Firstpage :
23
Lastpage :
26
Abstract :
In terms of energy consumption, the environment surrounding the manufacturing industries has become considerably strict. As a framework containing many production scheduling problems in manufacturing industries, a great deal of researches on the resource-constrained project scheduling problem (RCPSP) has been performed. We have proposed a RCPSP formulation called RCPSP/πRC, which can deal with realistic energy constraints such as power restriction during peak hours, contract demand, and energy consumption during the setup operations. In this paper, we evaluate RCPSP/πRC through computational experiments. The proposed method is compared with two heuristic rules. Results of computational experiments show the effectiveness of the proposed method.
Keywords :
energy conservation; energy consumption; manufacturing industries; production control; project management; scheduling; RCPSP formulation; energy constraints; energy consumption; energy saving; manufacturing industries; power restriction; production scheduling problems; resource constraint project scheduling problem; Contracts; Energy consumption; Job shop scheduling; Optimization; Processor scheduling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
System Science and Engineering (ICSSE), 2014 IEEE International Conference on
Conference_Location :
Shanghai
Type :
conf
DOI :
10.1109/ICSSE.2014.6887897
Filename :
6887897
Link To Document :
بازگشت