DocumentCode :
1799156
Title :
Performance degradation prediction of hydropower unit based on grey prediction model
Author :
Xueli An ; Yongjun Tang
Author_Institution :
China Inst. of Water Resources & Hydropower Res., Beijing, China
fYear :
2014
fDate :
18-20 Aug. 2014
Firstpage :
414
Lastpage :
416
Abstract :
A performance degradation model of hydropower unit is proposed based on three-dimensional surface. In the model, the influence of active power and working head of hydropower unit is analyzed. The grey prediction model (GM (1, 1) model) is used to predict the performance degradation trend of hydropower unit. Real data of condition monitoring are utilized to verify the proposed method. Results show that the presented method can effectively predict the change trend of hydropower unit performance degradation time series.
Keywords :
condition monitoring; grey systems; hydroelectric power stations; time series; GM(1,1) model; condition monitoring; grey prediction model; hydropower unit performance degradation prediction; three-dimensional surface; time series; Data models; Degradation; Hydroelectric power generation; Market research; Predictive models; Time series analysis; Vibrations;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent Control and Information Processing (ICICIP), 2014 Fifth International Conference on
Conference_Location :
Dalian
Print_ISBN :
978-1-4799-3649-6
Type :
conf
DOI :
10.1109/ICICIP.2014.7010289
Filename :
7010289
Link To Document :
بازگشت