DocumentCode
1807944
Title
Study on risk management in CBM project
Author
Liu Zhi-yong ; Rong Li-qing ; Jia Xi-sheng
Author_Institution
Management dept., ShiJiaZhuang, HeBei Province, China
fYear
2013
fDate
1-8 Jan. 2013
Firstpage
1
Lastpage
4
Abstract
The frame of risk management system was established and risk analysis was addressed. First, the inherent risk factors in the CBM project were identified based on work breakdown structure method of project management. Then, the technical risks in implementing the CBM project were assessed with the fuzzy synthetic evaluation method and the assessment results were discussed. Finally, risk response measures for risk response were suggested.
Keywords
condition based maintenance; risk analysis; risk assessment; risk management; risk response;
fLanguage
English
Publisher
ieee
Conference_Titel
Conference Anthology, IEEE
Conference_Location
China
Type
conf
DOI
10.1109/ANTHOLOGY.2013.6785066
Filename
6785066
Link To Document