A Simulation-Ga Based Model for Production Planning in Precast Plant
Author :
Zhai, Xiaofeng ; Tiong, Robert L.K. ; Bjornsson, Hans C. ; Chua, David K.H.
Author_Institution :
Sch. of Civil & Environ. Eng., Nanyang Technol. Univ.
fYear :
2006
fDate :
3-6 Dec. 2006
Firstpage :
1796
Lastpage :
1803
Abstract :
Planning plays an important role in precast production management. In practice, however, this work is primarily carried out on a rule-of-thumb basis. A specialized planning model based on simulation technique and genetic algorithm (GA) is presented in this paper for make-to-order precast production. A novel priority rule, the critical precast component (CP) rule, is established for mold considerations during simulation, and a bi-directional simulation is adopted to reduce excessive overtime and precast stock. On this basis, three simulation approaches are designed using different simulation heuristics and directions. To test the validity of the proposed model with different approaches, a planning experiment is carried out. By comparison, it is clear that the simulation-GA based model using CP rule and bi-directional simulation can generate a satisfying resource plan and production schedule
Keywords :
casting; digital simulation; genetic algorithms; production planning; bidirectional simulation; genetic algorithm; make-to-order precast production; precast production management; production planning; Bidirectional control; Capacity planning; Civil engineering; Concrete; Delay; Job shop scheduling; Manufacturing; Personal communication networks; Production planning; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Simulation Conference, 2006. WSC 06. Proceedings of the Winter
Conference_Location :
Monterey, CA
Print_ISBN :
1-4244-0500-9
Electronic_ISBN :
1-4244-0501-7
Type :
conf
DOI :
10.1109/WSC.2006.322957
Filename :
4117815
Link To Document :
بازگشت