DocumentCode :
1808139
Title :
A Full Factory Transient Simulation Model for the Analysis of Expected Performance in a Transition Period
Author :
Klein, Moti ; Kalir, Adar
Author_Institution :
Intel Corp., Qiriat-Gat
fYear :
2006
fDate :
3-6 Dec. 2006
Firstpage :
1836
Lastpage :
1839
Abstract :
Intel´s Fab-18 is based in Israel, and has transitioned from producing 0.18-micron logic devices to producing 90 nM flash products. During this transition period, the factory has de-ramped in volume of logic while ramping-up flash. AutoSched AP software was utilized for the development of a transient simulation model of the Fab´s behavior during this period. It is the first attempt, at Intel, to utilize a full factory simulation in order to analyze and support decisions that pertain to a transient period of parallel de-ramp and ramp-up of technologies. Unlike typical simulation models for the analysis of factory performance and behavior in steady-state, the transient model poses several modeling challenges and requires major adjustments in dealing with these challenges. In this paper, we discuss those aspects. The benefits and contribution of such a model to decision making and the improvement of factory performance are also presented
Keywords :
DP industry; digital simulation; facilities planning; logic devices; production engineering computing; 0.18-micron logic devices; 90 nM flash products; AutoSched AP software; Intel Fab-18; factory performance; full factory transient simulation model; Analytical models; Logic devices; Manufacturing processes; Paper technology; Performance analysis; Production facilities; Semiconductor device modeling; Space technology; Steady-state; Transient analysis;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Simulation Conference, 2006. WSC 06. Proceedings of the Winter
Conference_Location :
Monterey, CA
Print_ISBN :
1-4244-0500-9
Electronic_ISBN :
1-4244-0501-7
Type :
conf
DOI :
10.1109/WSC.2006.322963
Filename :
4117821
Link To Document :
بازگشت