    Simulation-Based Scheduling of Parallel Wire-Bonders with Limited Clamp&Paddles

  • Author

    Quadt, Daniel

  • Author_Institution
    Infineon Technol. AG, Regensburg
  • fYear
    2006
  • fDate
    3-6 Dec. 2006
  • Firstpage
    1887
  • Lastpage
    1892
  • Abstract
    We present a scheduling procedure for the wire-bonding operation of a semiconductor assembly facility. The wire-bonding operation typically consists of a large number of unrelated parallel machines and is typically one of the bottlenecks in an assembly facility. The scheduling procedure is able to handle setup times, limited fixtures (clamp&paddles) and non-zero machine ready-times (initial work in progress). It is based on a simulator that generates a schedule and a simulated annealing approach to optimize the schedule. Some preliminary results from an implementation in a large assembly facility are given
  • Keywords
    scheduling; semiconductor device manufacture; simulated annealing; assembly facility; limited clamp&paddles; nonzero machine ready-times; parallel machines; parallel wire-bonding operation; simulated annealing; simulation-based scheduling; Assembly; Contacts; Fabrication; Fixtures; Job shop scheduling; Lead; Manufacturing processes; Parallel machines; Probes; Simulated annealing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference, 2006. WSC 06. Proceedings of the Winter
  • Conference_Location
    Monterey, CA
  • Print_ISBN
    1-4244-0500-9
  • Electronic_ISBN
    1-4244-0501-7
  • Type

    conf

  • DOI
    10.1109/WSC.2006.322970
  • Filename
    4117828