Abstract :
The standard bulk current test, long line test and transfer impedance test all have their advantages when industrial plant is qualified. Historically with the exception of military testing, EMC specifications and testing have been directed towards white goods and not large industrial plant. To redress this balance this paper looks at the key site tests and some of the major on-site threats