• DocumentCode
    1810524
  • Title

    Simulation of the Pig Iron Transportation System in Companhia Siderurgica Tubarao - Arcelor Group

  • Author

    de Norman, A.

  • Author_Institution
    Belge Engenharia e Sistemas, Sao Paulo
  • fYear
    2006
  • fDate
    3-6 Dec. 2006
  • Firstpage
    2305
  • Lastpage
    2305
  • Abstract
    Summary form only given. The objective of this paper is to present the development of a simulation model involving materials handling in a large steel company from Arcelor Group. The project had a return of more than 2 million USD and points to a kind of application that seems to be a typical case where static analysis may cause great errors comparing to a dynamic one (because the results were also observed in another Brazilian steel company). The project focused in the processes involving pig iron transportation between the blast furnaces and its discharge in the steelmaking plant. It allowed the evaluation of several operational parameters such as for the 7.5 Mt/year production rhythm, a great increase from the actual production of 5 Mt/year. "Bottlenecks" in the flow were identified through the results and the scenarios gave the support to the decision of increasing the number of torpedo-cars and locomotives in the system
  • Keywords
    digital simulation; materials handling; steel industry; transportation; Arcelor Group; Brazilian steel company; Companhia Siderurgica Tubarao; blast furnaces; materials handling; pig iron transportation system; simulation model; static analysis; steelmaking plant; Blast furnaces; Iron; Materials handling; Production; Rhythm; Steel; Transportation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference, 2006. WSC 06. Proceedings of the Winter
  • Conference_Location
    Monterey, CA
  • Print_ISBN
    1-4244-0500-9
  • Type

    conf

  • DOI
    10.1109/WSC.2006.323096
  • Filename
    4117902