• DocumentCode
    1820154
  • Title

    A IDEF0-based methodology for project reliability assessment

  • Author

    Ismail, Hossam S. ; Rashid, Mustafa ; Zhu, Ping ; Poolton, Jenny

  • Author_Institution
    Manage. Sch., Univ. of Liverpool, Liverpool, UK
  • fYear
    2010
  • fDate
    7-10 Dec. 2010
  • Firstpage
    1568
  • Lastpage
    1572
  • Abstract
    This paper builds on an approach developed by the authors for extending IDEF0 modelling to act as a process reliability assessment tool. By quantifying the quality of the activity inputs the approach is able to assess the quality of activity outputs. The paper addresses how this approach is applied at a higher level to represent existing project management frameworks to improve their applicability. Two of these are PRINCE2 which is widely adopted in the UK and the second is PMBOK widely used in the USA. In this paper PRINCE2 is dealt with in detail while a recommendation for applying it to PMBOK is presented.
  • Keywords
    project management; reliability; IDEF0 based methodology; PMBOK; PRINCE2; Project In Controlled Environment 2; Project Management Body of Knowledge; project reliability assessment tool; Analytical models; Planning; Process control; Project management; Reliability; Uncertainty; IDEF0; PMBOK; PRINCE2; Project Management; Reliability;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management (IEEM), 2010 IEEE International Conference on
  • Conference_Location
    Macao
  • ISSN
    2157-3611
  • Print_ISBN
    978-1-4244-8501-7
  • Electronic_ISBN
    2157-3611
  • Type

    conf

  • DOI
    10.1109/IEEM.2010.5674172
  • Filename
    5674172