Decision on maintenance period for power transformer based on Monte Carlo simulation of reliability
Author :
Liu, Na ; Gao, Wensheng ; Tan, Kexiong ; Wang, Liufang ; Liang, Guodong ; Li, Wei
Author_Institution :
Dept. of Electr. Eng., Tsinghua Univ., Beijing, China
Volume :
1
fYear :
2003
fDate :
1-5 June 2003
Firstpage :
479
Abstract :
The problem of selecting a suitable maintenance period is vital for preventive maintenance of power transformer. Traditionally, maintenance period can be calculated by model with an objective function, such as availability, maintenance cost, or reliability of the equipment. However, it is difficult to directly apply these models for power transformer, because its reliability is high, and there is no enough reliability data to calculate the objective functions. Therefore, a simulated maintenance period model is developed in this paper. Firstly, Monte Carlo method and Fault Tree method are applied to generate simulated fault times of the transformer system. Secondly, Mission Reliability is calculated based on these simulated data and acts as the objective function in the model. Finally, this model is applied to investigate the maintenance period of power transformer.
Keywords :
Monte Carlo methods; fault trees; power system faults; power system reliability; power transformer testing; Monte Carlo simulation; fault tree method; mission reliability; power transformer maintenance period; Availability; Distribution functions; Fault trees; Maintenance; Monte Carlo methods; Power system modeling; Power system reliability; Power system simulation; Power transformers; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Properties and Applications of Dielectric Materials, 2003. Proceedings of the 7th International Conference on
ISSN :
1081-7735
Print_ISBN :
0-7803-7725-7
Type :
conf
DOI :
10.1109/ICPADM.2003.1218455
Filename :
1218455
Link To Document :
بازگشت