DocumentCode :
1823135
Title :
Modified Max-Plus Linear representation for inserting time buffers
Author :
Yoshida, S. ; Takahashi, H. ; Goto, H.
Author_Institution :
Dept. of Manage. & Inf. Syst. Eng., Nagaoka Univ. of Technol., Nagaoka, Japan
fYear :
2010
fDate :
7-10 Dec. 2010
Firstpage :
1631
Lastpage :
1635
Abstract :
The Max-Plus Linear (MPL) representation is known as a useful solution of scheduling problems for a class of discrete event systems. In such systems, an initial schedule is frequently changed due to unpredictable disturbances. On the other hand, the Critical Chain Project Management (CCPM) method is an effective management tool for protecting projects from delays. In view of this, we have proposed a method of applying the concepts in the CCPM framework to the MPL representation, to control undesirable state changes. In our previous method, several time buffers were virtually inserted as new processes to avoid delays. With this method, however, it is difficult to figure out the relationship between the original structure and the modified one after the CCPM has been applied. Hence this paper proposes a method for taking into account time buffers without installing new virtual processes in the MPL-CCPM representation.
Keywords :
discrete event systems; project management; scheduling; critical chain project management; discrete event systems; max plus linear representation; scheduling problems; time buffers insertion; Delay; Equations; Focusing; Materials; Matrix decomposition; Project management; Critical Chain Project Management; Max-Plus Algebra; Max-Plus Linear System; State-Space Representation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management (IEEM), 2010 IEEE International Conference on
Conference_Location :
Macao
ISSN :
2157-3611
Print_ISBN :
978-1-4244-8501-7
Electronic_ISBN :
2157-3611
Type :
conf
DOI :
10.1109/IEEM.2010.5674287
Filename :
5674287