Title :
Development of high power high efficiency S-band PPM klystrons
Author :
Ferguson, P. ; Read, Michael ; Ives, L.
Author_Institution :
Calabazas Creek Res., Inc., San Mateo, CA, USA
Abstract :
Calabazas Creek Research is developing several high power S-band periodic permanent magnet (PPM) focused klystrons. We report on the design of a 5.5 MW pulsed klystron and a 75 MW pulsed klystron, both for providing high peak power for advanced accelerators. The efficiency requirement of both klystrons is determined by system requirements. We will present results from extensive simulations using out in-house large signal klystron code (KLSC) and the large signal code TESLA. We will also describe our unique PPM structures which permits direct access to frequency tuning and liquid cooling of the individual cavities.
Keywords :
klystrons; permanent magnets; Calabazas Creek Research; KLSC; PPM structures; TESLA signal code; advanced accelerators; efficiency requirement; frequency tuning; high efficiency S-band PPM klystrons; high power S-band PPM klystrons; high power S-band periodic permanent magnet focused klystrons; liquid cooling; peak power; power 5.5 MW; power 75 MW; pulsed klystron; signal klystron code; system requirements; Cavity resonators; Klystrons; Magnetic separation; Power generation; Radio frequency; Saturation magnetization; Tuning;
Conference_Titel :
Vacuum Electronics Conference, IEEE International
Conference_Location :
Monterey, CA
DOI :
10.1109/IVEC.2014.6857641