DocumentCode :
1824921
Title :
Standard Activity Measurement Plan
Author :
Manalo, R.G. ; Valenzuela-Manalo, M.D.
Author_Institution :
Manila Electr. Co., Pasig City, Philippines
fYear :
2010
fDate :
7-10 Dec. 2010
Firstpage :
2470
Lastpage :
2474
Abstract :
This paper deals with a framework that combines the complementary features of Activity-Based Costing (ABC) and Time-Driven Activity-Based Costing (TDABC). The framework or Standard Activity Measurement Plan is anchored on computing unit cost given the required minimum resources for a particular activity. The activity unit cost is standard and fixed for a certain period until such time significant variables change significantly. The standard unit time per activity is also used to establish the percentage of time spent. In this manner, ABC data collection is minimized if not eliminated totally.
Keywords :
costing; minimisation; planning; activity unit cost; data collection minimization; standard activity measurement plan; standard unit time per activity; time-driven activity based costing; Companies; Costing; Driver circuits; Standards activities; Standards organizations; Activity-Based Budgeting; Activity-Based Costing; Time-Driven Activity-Based Costing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management (IEEM), 2010 IEEE International Conference on
Conference_Location :
Macao
ISSN :
2157-3611
Print_ISBN :
978-1-4244-8501-7
Electronic_ISBN :
2157-3611
Type :
conf
DOI :
10.1109/IEEM.2010.5674352
Filename :
5674352
Link To Document :
بازگشت