DocumentCode
1825480
Title
Parallel machines scheduling with dual criteria and sequence-dependent setups: Cooperative metaheuristics
Author
Behnamian, J. ; Ghomi, S. M T Fatemi
Author_Institution
Dept. of Ind. Eng., Amirkabir Univ. of Technol., Tehran, Iran
fYear
2010
fDate
7-10 Dec. 2010
Firstpage
1256
Lastpage
1260
Abstract
This paper presents a min-max multi-objective procedure for a dual-objective, namely makespan, and sum of the earliness and tardiness of jobs in due window problems, simultaneously. This research extends the new hybrid metaheuristic for solving parallel machines scheduling problems with sequence-dependent setup times which comprises three components: an initial population generation method based on an ant colony optimization (ACO), a simulated annealing (SA) as an evolutionary stochastic searching algorithm, and a variable neighborhood search which involves three local search procedures to improve the population. In addition, two variable neighborhood search (VNS) based hybrid metaheuristics, which are a combination of two methods, SA/VNS and ACO/VNS, are also proposed for solving the addressed scheduling problems. The non-dominated sets obtained from each of algorithms are compared in terms of various indices, and the computational results show that the proposed algorithm is capable of producing a number of high-quality Pareto optimal scheduling plans.
Keywords
Pareto optimisation; evolutionary computation; job shop scheduling; minimax techniques; search problems; simulated annealing; stochastic programming; Pareto optimal scheduling plans; ant colony optimization; cooperative metaheuristics; dual criteria; earliness sum; evolutionary stochastic searching algorithm; hybrid metaheuristic; initial population generation method; job tardiness; local search procedures; makespan; min-max multi-objective procedure; parallel machines scheduling; sequence-dependent setup times; sequence-dependent setups; simulated annealing; variable neighborhood search; Algorithm design and analysis; Job shop scheduling; Optimal scheduling; Parallel machines; Processor scheduling; Hybrid metaheuristic; Makespan Multi-objective optimization; Parallel machines scheduling; Sequence dependent setup times;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IEEM), 2010 IEEE International Conference on
Conference_Location
Macao
ISSN
2157-3611
Print_ISBN
978-1-4244-8501-7
Electronic_ISBN
2157-3611
Type
conf
DOI
10.1109/IEEM.2010.5674376
Filename
5674376
Link To Document