• DocumentCode
    1829656
  • Title

    Preemptive resource constrained project scheduling problem with uncertain resource availabilities: Investigate worth of proactive strategies

  • Author

    Fallah, M. ; Aryanezhad, M.B. ; Ashtiani, B.

  • Author_Institution
    Dept. of Ind. Eng., Islamic Azad Univ., Tehran, Iran
  • fYear
    2010
  • fDate
    7-10 Dec. 2010
  • Firstpage
    646
  • Lastpage
    650
  • Abstract
    Resource constraint project scheduling problem under stochastic circumstances have been considered in recent decades where uncertainty is modeled by means of activities´ duration. In this paper we study an extension of basic stochastic RCPSP in which uncertainty come to play on resource availabilities. We have also pursued preempt-resume mode in case of activities breakdown due to resource infeasibility. A solution for this variant of RCPSP is defined in two steps by utilizing heuristic procedures for creating initial schedule and adding time and resource buffers in order to yields proactive schedule to cope with adverse effects of uncertainties. Numerical results revealed that proposed procedure yields significant performance gains over the ignorance of proactive strategies.
  • Keywords
    project management; scheduling; preemptive resource constrained project scheduling; proactive strategy; resource constraint project scheduling; uncertain resource availability; Availability; Electric breakdown; Job shop scheduling; Robustness; Schedules; Transmission line measurements; Uncertainty; Proactive strategies; Stochastic RCPSP; uncertain resource availabilities;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management (IEEM), 2010 IEEE International Conference on
  • Conference_Location
    Macao
  • ISSN
    2157-3611
  • Print_ISBN
    978-1-4244-8501-7
  • Electronic_ISBN
    2157-3611
  • Type

    conf

  • DOI
    10.1109/IEEM.2010.5674528
  • Filename
    5674528