DocumentCode
1829656
Title
Preemptive resource constrained project scheduling problem with uncertain resource availabilities: Investigate worth of proactive strategies
Author
Fallah, M. ; Aryanezhad, M.B. ; Ashtiani, B.
Author_Institution
Dept. of Ind. Eng., Islamic Azad Univ., Tehran, Iran
fYear
2010
fDate
7-10 Dec. 2010
Firstpage
646
Lastpage
650
Abstract
Resource constraint project scheduling problem under stochastic circumstances have been considered in recent decades where uncertainty is modeled by means of activities´ duration. In this paper we study an extension of basic stochastic RCPSP in which uncertainty come to play on resource availabilities. We have also pursued preempt-resume mode in case of activities breakdown due to resource infeasibility. A solution for this variant of RCPSP is defined in two steps by utilizing heuristic procedures for creating initial schedule and adding time and resource buffers in order to yields proactive schedule to cope with adverse effects of uncertainties. Numerical results revealed that proposed procedure yields significant performance gains over the ignorance of proactive strategies.
Keywords
project management; scheduling; preemptive resource constrained project scheduling; proactive strategy; resource constraint project scheduling; uncertain resource availability; Availability; Electric breakdown; Job shop scheduling; Robustness; Schedules; Transmission line measurements; Uncertainty; Proactive strategies; Stochastic RCPSP; uncertain resource availabilities;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IEEM), 2010 IEEE International Conference on
Conference_Location
Macao
ISSN
2157-3611
Print_ISBN
978-1-4244-8501-7
Electronic_ISBN
2157-3611
Type
conf
DOI
10.1109/IEEM.2010.5674528
Filename
5674528
Link To Document