DocumentCode :
1829714
Title :
A two-stage stochastic programming model for resource allocation in project management
Author :
Xu, Dongsheng ; Ye, Yinhua ; Lu, Yingna ; Deng, Shujin
Author_Institution :
Sch. of Bus., Sun Yat-sen Univ., Guangzhou, China
fYear :
2010
fDate :
7-10 Dec. 2010
Firstpage :
656
Lastpage :
660
Abstract :
In a large-scale construction project, the project manager needs to allocate many resources, including numerous workers, various kinds of materials, and a lot of cash. Therefore how to allocate resources and to control cash flow ahead of time is particularly important. The general contract and material price fluctuation make the project manager to take great risk. In this paper, we establish a two-stage stochastic programming model which takes price fluctuation, working capital and other necessary constraints into account. We employ a sample-based heuristic to study how price fluctuation affects the progress schedule of the project. We also conduct sensitivity analysis on the important parameters, including working capital and labor cost.
Keywords :
construction industry; contracts; pricing; project management; stochastic programming; contract; labor cost; large-scale construction project; material price fluctuation; project management; resource allocation; sample-based heuristic; stochastic programming; working capital; Computational modeling; Materials; Programming; Project management; Schedules; Sensitivity analysis; Stochastic processes; Price fluctuation; Project management; Stochastic programming;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management (IEEM), 2010 IEEE International Conference on
Conference_Location :
Macao
ISSN :
2157-3611
Print_ISBN :
978-1-4244-8501-7
Electronic_ISBN :
2157-3611
Type :
conf
DOI :
10.1109/IEEM.2010.5674530
Filename :
5674530
Link To Document :
بازگشت