• DocumentCode
    1832642
  • Title

    Preliminary Thoughts on Cost-based Investment Decisions in IT: A Problem Analysis

  • Author

    Gitzel, Ralf ; Cuske, Christian ; Münch, Carsten

  • Author_Institution
    Ind. Software Syst. Lab., ABB Corp. Res. Germany, Ladenburg, Germany
  • fYear
    2011
  • fDate
    22-26 Aug. 2011
  • Firstpage
    385
  • Lastpage
    389
  • Abstract
    IT investments are evaluated using varying criteria, in which financial aspects play a central role. Today a financial estimation of the Total Cost of Ownership (TCO) or the Life Cycle Cost (LCC) is one of the pillars of IT investment decisions. While this approach works well for known cost factors, we argue that the existing cost-based approaches are insufficient for handling cost associated with stochastic elements (risks). In this paper, we present a short review of existing cost-based investment evaluations and use an example to illustrate why we feel that these approaches do not cover all necessary aspects of the consequences triggered by IT investments. We also suggest a rough outline for a solution to this problem as a roadmap for our future work.
  • Keywords
    costing; information technology; investment; IT investments; cost factors; cost-based investment decisions; financial estimation; life cycle cost; total cost of ownership; Frequency measurement; Investments; Loss measurement; Maintenance engineering; Reactive power; Sensitivity analysis; Servers; IT Cost; IT Investment; Life Cycle Cost; Total Cost of Ownership;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Availability, Reliability and Security (ARES), 2011 Sixth International Conference on
  • Conference_Location
    Vienna
  • Print_ISBN
    978-1-4577-0979-1
  • Electronic_ISBN
    978-0-7695-4485-4
  • Type

    conf

  • DOI
    10.1109/ARES.2011.64
  • Filename
    6045989