DocumentCode
1837089
Title
Impact of design variables on balancing markets
Author
Frunt, J. ; Kling, W.L. ; Hermans, R.M. ; Nobel, F.A. ; de Boer, W.W.
Author_Institution
Eindhoven Univ. of Technol., Eindhoven, Netherlands
fYear
2010
fDate
23-25 June 2010
Firstpage
1
Lastpage
6
Abstract
In electrical power systems there must always exist a balance between generation and load. Any imbalance will result in a frequency deviation and a deviation from the scheduled cross border exchange. To maintain and restore the balance in a certain area balancing systems exist. Balancing systems based on balance responsibility are affected by several design variables. This article discusses the effect of the programme time unit length and the gate-closure time.
Keywords
power markets; power system economics; balance responsibility; balancing markets; balancing systems; electrical power systems; frequency deviation; gate-closure time; programme time unit length; Load modeling; Ancillary services; Balance responsibility; Balancing; Gate-closure time; Programme time unit;
fLanguage
English
Publisher
ieee
Conference_Titel
Energy Market (EEM), 2010 7th International Conference on the European
Conference_Location
Madrid
Print_ISBN
978-1-4244-6838-6
Type
conf
DOI
10.1109/EEM.2010.5558680
Filename
5558680
Link To Document