• DocumentCode
    1837089
  • Title

    Impact of design variables on balancing markets

  • Author

    Frunt, J. ; Kling, W.L. ; Hermans, R.M. ; Nobel, F.A. ; de Boer, W.W.

  • Author_Institution
    Eindhoven Univ. of Technol., Eindhoven, Netherlands
  • fYear
    2010
  • fDate
    23-25 June 2010
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    In electrical power systems there must always exist a balance between generation and load. Any imbalance will result in a frequency deviation and a deviation from the scheduled cross border exchange. To maintain and restore the balance in a certain area balancing systems exist. Balancing systems based on balance responsibility are affected by several design variables. This article discusses the effect of the programme time unit length and the gate-closure time.
  • Keywords
    power markets; power system economics; balance responsibility; balancing markets; balancing systems; electrical power systems; frequency deviation; gate-closure time; programme time unit length; Load modeling; Ancillary services; Balance responsibility; Balancing; Gate-closure time; Programme time unit;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Energy Market (EEM), 2010 7th International Conference on the European
  • Conference_Location
    Madrid
  • Print_ISBN
    978-1-4244-6838-6
  • Type

    conf

  • DOI
    10.1109/EEM.2010.5558680
  • Filename
    5558680