• DocumentCode
    1837586
  • Title

    Generation&transmission planning and electricity market: The role of TSO

  • Author

    Falvo, M.C.

  • Author_Institution
    Dept. of Electr. Eng., Univ. of Rome Sapienza, Rome, Italy
  • fYear
    2010
  • fDate
    23-25 June 2010
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    In a competitive environment the generation and transmission systems planning (GS&TS-P) becomes more complex and needs new approaches, criteria and models. Referring to the attribute named flexibility of the transmission system in respect of generation changes, and to some validated indexes for its evaluation (Uncertainty Scenario Flexibility Indexes - USFI), the author proposes the integration of this attribute in a Generation System-follows-Transmission System planning, stressing the importance of this stage for the Highly Developed Power Systems (HDPS) such as the Italian National Transmission System (INTS).
  • Keywords
    power generation economics; power generation planning; power transmission economics; power transmission planning; Italian National Transmission System; electricity market; generation systems planning; highly developed power systems; transmission system operator; transmission systems planning; uncertainty scenario flexibility indexes; Biological system modeling; Generators; Variable speed drives; Electricity Market; Flexibility; Generation; Planning; Transmission;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Energy Market (EEM), 2010 7th International Conference on the European
  • Conference_Location
    Madrid
  • Print_ISBN
    978-1-4244-6838-6
  • Type

    conf

  • DOI
    10.1109/EEM.2010.5558705
  • Filename
    5558705