DocumentCode :
1837586
Title :
Generation&transmission planning and electricity market: The role of TSO
Author :
Falvo, M.C.
Author_Institution :
Dept. of Electr. Eng., Univ. of Rome Sapienza, Rome, Italy
fYear :
2010
fDate :
23-25 June 2010
Firstpage :
1
Lastpage :
6
Abstract :
In a competitive environment the generation and transmission systems planning (GS&TS-P) becomes more complex and needs new approaches, criteria and models. Referring to the attribute named flexibility of the transmission system in respect of generation changes, and to some validated indexes for its evaluation (Uncertainty Scenario Flexibility Indexes - USFI), the author proposes the integration of this attribute in a Generation System-follows-Transmission System planning, stressing the importance of this stage for the Highly Developed Power Systems (HDPS) such as the Italian National Transmission System (INTS).
Keywords :
power generation economics; power generation planning; power transmission economics; power transmission planning; Italian National Transmission System; electricity market; generation systems planning; highly developed power systems; transmission system operator; transmission systems planning; uncertainty scenario flexibility indexes; Biological system modeling; Generators; Variable speed drives; Electricity Market; Flexibility; Generation; Planning; Transmission;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Energy Market (EEM), 2010 7th International Conference on the European
Conference_Location :
Madrid
Print_ISBN :
978-1-4244-6838-6
Type :
conf
DOI :
10.1109/EEM.2010.5558705
Filename :
5558705
Link To Document :
بازگشت