Title :
Using real time dispatcher as a decision-making support system to resolve overlapping dispatching problem in FAB manufacturing
Author :
Chen, Ying-Jen ; Huang, Kuo-Sung ; Chen, Will ; Hsu, Yu-Ja
Author_Institution :
MACRONIX Int. Co. Ltd., Hsinchu, Taiwan
Abstract :
This paper describes a DSS (decision-making support system) for solving tool overlapping problems by using a real time dispatching system developed in MXIC FAB I. The problem issue and the system are first presented, followed by the description of the algorithm for solving tool overlapping. We found that operators can obtain the tool arrangement information very quickly through this DSS. With its precise forecast of coming WIP and calculation, our algorithm increases tool utilization by 10~13% as well as delivering a short cycle time for BTO (build-to-order) products
Keywords :
computer aided production planning; decision support systems; electronic engineering computing; integrated circuit manufacture; production control; real-time systems; DSS; FAB manufacturing; IC production; WIP forecast; build-to-order products; decision-making support system; overlapping dispatching problem; real time dispatcher; real time dispatching system; tool arrangement information; tool overlapping; tool overlapping problem; tool utilization; wafer fab dispatching; wafer fabrication; Databases; Decision making; Decision support systems; Dispatching; Electric breakdown; Fabrication; Manufacturing; Production; Real time systems; Resource management;
Conference_Titel :
Semiconductor Manufacturing Symposium, 2001 IEEE International
Conference_Location :
San Jose, CA
Print_ISBN :
0-7803-6731-6
DOI :
10.1109/ISSM.2001.962915