DocumentCode
1838276
Title
Two approaches to determine appropriated fab manufacturing production plan by cycle-time and WIP energy
Author
Ko Chen Pin ; Lee Yen Fei ; Ang Chee Teck
Author_Institution
Manuf. Dept., Syst. on Silicon Manuf. Co. Pte. Ltd., Singapore
fYear
2001
fDate
2001
Firstpage
87
Lastpage
90
Abstract
The paper presents two approaches to determine the foundry fab manufacturing production plan. The two approaches are namely, the Cycle Time Oriented (CTO) method the WIP Energy Oriented (WEO) method. The objective of CTO method is to derive a model with the consideration in the aspects of the master production plan (MPP) and cycle time (CT). On the other hand, the WEO model explores the consideration of the WIP balancing and linear wafer out (or planned wafer out) to determine the amount of stage-moves demand. The concepts and models were built and applied over a period in SSMC and therefore, giving birth to a complete study for manufacturing production plan
Keywords
computer aided production planning; computer integrated manufacturing; integrated circuit yield; manufacturing resources planning; WIP balancing; WIP energy oriented method; cycle time oriented method; daily stage move target; foundry fab manufacturing production plan; master production plan; on-time delivery capability; percentage daily stage-move target; Assembly; Bismuth; Foundries; Production; Pulp manufacturing; Semiconductor device modeling; Silicon; Virtual manufacturing;
fLanguage
English
Publisher
ieee
Conference_Titel
Semiconductor Manufacturing Symposium, 2001 IEEE International
Conference_Location
San Jose, CA
Print_ISBN
0-7803-6731-6
Type
conf
DOI
10.1109/ISSM.2001.962921
Filename
962921
Link To Document