DocumentCode :
1847730
Title :
Cement plant expansion cost evaluation for new and upgraded installations
Author :
Conroy, Geoffrey H.
Author_Institution :
KHD Humboldt Wedag, Atlanta, GA, USA
fYear :
1998
fDate :
17-21 May 1998
Firstpage :
211
Lastpage :
231
Abstract :
This timely paper attempts to summarize and simplify the difficult topic of estimated project cost for new cement plant capacity and major plant upgrades. The initial review discusses new cement plant construction cost and offers a cost estimate for four typical plant sizes which have been recently studied by the writer. The costs shown are the result of calculated cost estimates for each main process area for the capacities required, not ratios or formulae. These results are then shown to form a capacity vs. cost curve. A brief review of the choices between new production lines vs. upgrade lines for each main process area is also discussed. Finally, the method of project execution is debated to highlight its importance and influence on project cost and schedule
Keywords :
cement industry; costing; economics; project engineering; project management; capacity vs. cost curve; cement plants; construction cost; expansion cost evaluation; management; new installations; project cost; project cost estimation; project execution; project schedule; upgraded installations; Cities and towns; Costs; Investments; Meeting planning; Production facilities; USA Councils;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Cement Industry Technical Conference, 1998. 40th Conference Record. 1998 IEEE/PCA
Conference_Location :
Rapid City, SD
ISSN :
1079-9931
Print_ISBN :
0-7803-3941-X
Type :
conf
DOI :
10.1109/CITCON.1998.679249
Filename :
679249
Link To Document :
بازگشت