Total re-vamp of Cimento Tupi`s clinker production line at the Pedra do Sino plant
Author :
Pospisil, Jaroslav ; Cerny, Jaroslav
Author_Institution :
PSP Eng. A.S., Prerov, Czech Republic
Abstract :
The paper describes the original 1600 t/day plant as built in 1976, its modification in 1981, and the complete re-vamping and modernization project in 1992-1993, including five years of operating results and experience since then. It reports why the original preheater was replaced, the second branch modified, the precalciner added, the kiln shell replaced and the cooler re-designed. It further explains how this entire project was arranged for the kiln shut-down time of only 85 days
Keywords :
cement industry; grinding; maintenance engineering; motor drives; project engineering; 85 d; Brazil; cement plants; cooler re-design; kiln shell replace; modernization; modification; operating experience; operating results; precalciner; preheater replacement; projects; Buildings; Calcination; Cement industry; Cities and towns; Cyclones; Heating; Investments; Kilns; Production; Surface reconstruction;
Conference_Titel :
Cement Industry Technical Conference, 1998. 40th Conference Record. 1998 IEEE/PCA
Conference_Location :
Rapid City, SD
Print_ISBN :
0-7803-3941-X
DOI :
10.1109/CITCON.1998.679250