Title :
Modernization of Dacotah Cement´s Rapid City Plant
Author :
Rydquist, Dave ; Rauert, Tim
Author_Institution :
Dacotah Cement, USA
Abstract :
In the early 1990s Dacotah Cement undertook an evaluation of the plant´s long-term needs and direction. Capacity, fuel and electrical efficiencies, manpower, and regulatory issues were contributing factors. In 1993 a series of projects began that would keep the company in a competitive posture by the millenium. Included were automation and a central control facility, an indirect coal system, modifications to the suspension preheater kiln that would increase its capacity by over 30%, upgrading of the power distribution system, laboratory automation, improvement of the blend silo system, and some environmental improvement projects. A large portion of the improvements were completed in 1995 and are the main subject of this paper. The entire scope of improvements is scheduled for completion by the end of 1999
Keywords :
cement industry; industrial control; maintenance engineering; Dacotah Cement; Rapid City Plant; automation; blend silo system; central control facility; electrical efficiency; environmental improvement; fuel efficiency; indirect coal system; laboratory automation; manpower; modernization; plant capacity; power distribution system upgrade; regulatory issues; suspension preheater kiln; Automatic control; Automation; Cement industry; Centralized control; Cities and towns; Control systems; Kilns; Marketing and sales; Milling machines; Power distribution;
Conference_Titel :
Cement Industry Technical Conference, 1998. 40th Conference Record. 1998 IEEE/PCA
Conference_Location :
Rapid City, SD
Print_ISBN :
0-7803-3941-X
DOI :
10.1109/CITCON.1998.679253