DocumentCode
1848398
Title
Heuristic scheduling algorithm for flexible manufacturing systems with partially overlapping machine capabilities
Author
Wang, Chun ; Ghenniwa, Hamada ; Shen, Weiming
Author_Institution
Dept. of Electr. & Comput. Eng., Western Ontario Univ., London, Ont., Canada
Volume
3
fYear
2005
fDate
2005
Firstpage
1139
Abstract
This paper presents a new heuristic scheduling algorithm for flexible manufacturing systems (FMSs) with partially overlapping machine capabilities. Unlike traditional ´routing then sequencing´ methods, the algorithm solves routing and sequencing sub-problems of FMS scheduling simultaneously by combining several dispatching rules. The primary objective is to take advantage of the system flexibility provided by partially overlapping machine capabilities and various processing speeds associated with different machines in FMS. Simulation results show that for the class of FMS scheduling problems modeled in this paper, the algorithm generate valid schedules and improve solution quality at an average of 30% compared to a variation of the longest processing time first (LPT) rule.
Keywords
flexible manufacturing systems; scheduling; FMS scheduling problems; dispatching rules; flexible manufacturing systems; heuristic scheduling algorithm; longest processing time first rule; partially overlapping machine capabilities; routing-then-sequencing methods; system flexibility; Computer aided manufacturing; Control systems; Dispatching; Dynamic scheduling; Flexible manufacturing systems; Job shop scheduling; Manufacturing systems; Productivity; Routing; Scheduling algorithm;
fLanguage
English
Publisher
ieee
Conference_Titel
Mechatronics and Automation, 2005 IEEE International Conference
Conference_Location
Niagara Falls, Ont., Canada
Print_ISBN
0-7803-9044-X
Type
conf
DOI
10.1109/ICMA.2005.1626713
Filename
1626713
Link To Document