• DocumentCode
    1850966
  • Title

    The research on validity of artifact in BPM

  • Author

    Wang Ying ; Liu Guohua ; Huang Zhen ; Li Jihui ; Zhao Danfeng ; Zhang Fang

  • Author_Institution
    Coll. of Inf. Sci. & Eng., Yanshan Univ., Qinhuangdao, China
  • Volume
    3
  • fYear
    2011
  • fDate
    13-15 May 2011
  • Firstpage
    15
  • Lastpage
    18
  • Abstract
    One of the new trends in business process management (BPM) is data-centric. Business artifact is a data entity which records the business process. Because in the different time there are different business requests to an artifact, time constraints should be considered in the artifact-centric business process model. To analyze the validity of a business artifact is to verify whether it satisfies the corresponding business request at given time. This paper gives the definitions related to artifact which are extended with time constraints. Based on Petri net, an artifact validity model with time constraints is presented. An algorithm is given to check the validity and its complexity is analyzed. Research results show our method supports the time modeling to business artifact and provides a new way to verify the validity of business artifact.
  • Keywords
    Petri nets; business process re-engineering; BPM; Petri net; business artifact; business process management; data centric; data entity; Business; Complexity theory; Computational modeling; Firing; Manganese; Time factors; BPM; Petri net; artifact-centered; validity of artifact;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Business Management and Electronic Information (BMEI), 2011 International Conference on
  • Conference_Location
    Guangzhou
  • Print_ISBN
    978-1-61284-108-3
  • Type

    conf

  • DOI
    10.1109/ICBMEI.2011.5918029
  • Filename
    5918029