DocumentCode
1850966
Title
The research on validity of artifact in BPM
Author
Wang Ying ; Liu Guohua ; Huang Zhen ; Li Jihui ; Zhao Danfeng ; Zhang Fang
Author_Institution
Coll. of Inf. Sci. & Eng., Yanshan Univ., Qinhuangdao, China
Volume
3
fYear
2011
fDate
13-15 May 2011
Firstpage
15
Lastpage
18
Abstract
One of the new trends in business process management (BPM) is data-centric. Business artifact is a data entity which records the business process. Because in the different time there are different business requests to an artifact, time constraints should be considered in the artifact-centric business process model. To analyze the validity of a business artifact is to verify whether it satisfies the corresponding business request at given time. This paper gives the definitions related to artifact which are extended with time constraints. Based on Petri net, an artifact validity model with time constraints is presented. An algorithm is given to check the validity and its complexity is analyzed. Research results show our method supports the time modeling to business artifact and provides a new way to verify the validity of business artifact.
Keywords
Petri nets; business process re-engineering; BPM; Petri net; business artifact; business process management; data centric; data entity; Business; Complexity theory; Computational modeling; Firing; Manganese; Time factors; BPM; Petri net; artifact-centered; validity of artifact;
fLanguage
English
Publisher
ieee
Conference_Titel
Business Management and Electronic Information (BMEI), 2011 International Conference on
Conference_Location
Guangzhou
Print_ISBN
978-1-61284-108-3
Type
conf
DOI
10.1109/ICBMEI.2011.5918029
Filename
5918029
Link To Document